
Project produced by: Tim Bate.
This project involved using Clustor to vary the
input parameters of a disk fracture prediction program. The application
was designed to determine the number of cycles required before a disk of
certain dimensions will fracture and at what point, given the amount of
stress upon the structure and relative size of the crack. Clustor was used
to change the last two variables, testing a range of values to determine
the conditions under which the most cycles were required. The large parameter
range and run time made this an ideal task for Clustor.
|
|